Sunday, April 19, 2015
1012 C Street  •  Floresville, TX 78114  •  Phone: 830-216-4519  •  Fax: 830-393-3219  • 

WCN Site Search


Lost & Found

Lost: Female Pit Bull mix, tan/white color, wearing pink nylon collar, "Dixie," has scar on left front leg from surgery, last seen at 3959 CR 331, Friday evening, March 27. Reward! 830-393-7178.

VideoStill missing. Creekwood Please call with any info. May have recently had puppies. Red corgi mix. Very loved and missed by our family. Answers to Mellie. 501-442-1812. Any time!
Lost: Siamese cat, chocolate point male, Wildrose Lane off Hwy. 123, Stockdale. Reward! Please call 830-996-3069.
More Lost & Found ads ›

Help Wanted

The last thing I want to do is hurt you. But it's still on the list.
*Fair Housing notice. All help wanted advertising in this newspaper is subject to the Fair Housing Act which makes it illegal to advertise "any preference limitation or discrimination based on race, color, religion, sex, handicap, familial status, or national origin, or an intention, to make any such preference limitation or discrimination." This newspaper will not knowingly accept any advertising for help wanted ads, which is in violation of the law. Our readers are hereby informed that all dwellings advertised in this newspaper are available on an equal opportunity basis.
More Help Wanted ads ›

Featured Videos





Video Vault ›
WCN printingWCN your news your way subscribeWCN essential oils

Breaking News


CPS: Deely Power Plant Offline Following Silo Explosion




E-Mail this Story to a Friend
Print this Story
Contributed
September 10, 2013, 2:31pm
3,605 views | 2 comments

(San Antonio, TX) - CPS Energy’s 420-megawatt Deely 1 power plant experienced an explosion shortly before 11 a.m. CPS Energy officials quickly worked to evacuate the building and ensure all employees were accounted for and safe.

An initial investigation shows the cascade building -- a part that feeds coal into silos before it’s moved into the plant -- was damaged. The plant’s fire suppression system deployed, working as the safety system should. The plant was online at the time of the explosion, and operators are in the process of taking the plant offline for safety reasons and to investigate further.

Coal is fed into the cascade building by conveyors that move the commodity from coal piles. It is several steps removed from the point at which the coal is burned to make steam and turn a turbine to generate energy. Deely Power Plant is located at a 7,500-acre power station in southeast Bexar County that is owned and operated by the energy company.

CPS Energy is the nation’s largest municipally owned natural gas and electric company, providing service to 741,000 electric and 331,000 natural gas customers in the Greater San Antonio area. The company offers the lowest rates among the top 10 largest U.S. cities, while ranking number one in wind-energy capacity among municipally owned energy systems and number one in Texas for solar generation. For more information, visit www.cpsenergy.com.
 

Your Opinions and Comments

 
New Guy  
Wilson County  
September 10, 2013 10:39pm
 
Too bad 4th back yard was not close to this....she wanted EPA rules to be relaxed or done away with.

 
Senior Citizen  
Wilson County  
September 10, 2013 10:22pm
 
Expect to pay more for our electricity if it stays offline.

Share your comment or opinion on this story!


You must be logged in to post a comment.




Not a subscriber?
Subscriber, but no password?
Forgot password?

Breaking News Archives


Connally Memorial MC breaking news banner
Southern Electric
Malcom's Custom Welding
Voncille Bielefeld homeAllstate & McBride RealtyTriple R DC ExpertsHeavenly Touch home

  Copyright © 2007-2015 Wilson County News. All rights reserved. Web development by Drewa Designs.