Friday, August 28, 2015
1012 C Street  •  Floresville, TX 78114  •  Phone: 830-216-4519  •  Fax: 830-393-3219  • 

WCN Site Search


Lost & Found

*Includes FREE photo online! mywcn.com/lostandfound
Lost: Small black and white tortoise shell cat, 1-1/2 years old, since Aug. 8, Country Hills area, La Vernia, very friendly, "Cinnamon" but responds more to "Kitty," rhinestone collar with bell, shots and spayed, family loves and misses her terribly. Reward! 210-725-8082.
Found: Smartphone, morning of Wed., Aug. 12  on Chihuahua Street, La Vernia.  Call 830-779-5300 and describe.
More Lost & Found ads ›

Help Wanted

The Floresville Independent School District is accepting applications for District Wide Custodian Positions, 2:00 p.m. to 10:30 p.m. shift. Applications may be obtained online at www.fisd.us or contact Sylvia Campa at 830-393-5300 ext. 14002 for appointments. FISD Personnel Office is located at 1200 5th St., Floresville, Texas. 830-393-5300 (Office hours: 8:00-4:00). Applications will be accepted until all positions are filled. An Equal Opportunity Employer.
Mixer needed for local bakery In La Vernia TX. At least 2 years minimum experience. Apply in person at 1371 FM 1346 La Vernia TX 78121
More Help Wanted ads ›

Featured Videos





Video Vault ›

Commentaries


Keystone Has Been Shipping Canadian Oil to the U.S. for Years




E-Mail this Story to a Friend
Print this Story

Disclaimer:
The author of this entry is responsible for this content, which is not edited by the Wilson County News or wilsoncountynews.com.
September 19, 2013 | 2,020 views | Post a comment

By Merrill Matthews

Here's a little-known fact: The Keystone pipeline system has been transporting oil sands from Canada to U.S. refineries in the Midwest for three years -- with no major leaks and, more importantly, no major complaints from environmentalists.

The Keystone pipeline project includes four phases. The Keystone XL that has received so much media attention is only the last phase.

Phase 1 has been operating since 2010, carrying oil from Alberta across three Canadian provinces and six states to refineries in Illinois. Phase 2 put a link connecting the Phase 1 pipeline from Steele City, Nebraska, to Cushing, Oklahoma, a major U.S. oil refining and storage hub. It went operational two years ago, again with no major problems or complaints.

Phase 3 is currently under construction, extending the pipeline from Cushing to the Gulf refineries in Texas. President Obama even gave a speech in Cushing in March 2012--during his reelection bid--praising the pipeline extension as good for the economy.

The Keystone XL, the proposed Phase 4, would build a separate pipeline from Alberta, crossing only three states (Montana, South Dakota and Nebraska), and connecting to the existing pipeline in Steel City

While the Keystone XL would have the capacity to deliver more oil--830,000 barrels a day vs. 590,000 for Phase 1--its U.S. footprint is more than 200 miles shorter than Phase 1.

Environmentalists complained that Phase 4 would transport oil across environmentally sensitive areas of Nebraska. Governor Dave Heineman expressed similar concerns. So the pipeline builder, TransCanada Corp., has proposed to reroute the pipeline, which satisfied the governor and the Nebraska legislature. Even the U.S. State Department has said the risks are minimal

One reason TransCanada located the Phase 4 route where it did was to transport up to 100,000 barrels a day of U.S. crude oil from the Bakken reserves in North Dakota and Montana. That means the Keystone XL would be shipping high-quality U.S. oil to U.S. refineries.

Mr. Obama has recently turned defensive, claiming that the pipeline won't create many permanent jobs. But pipeline jobs are infrastructure jobs, and the president is promoting more infrastructure spending to create jobs.

Phases 1 and 2 directly employed nearly 9,000 workers on U.S. facilities and pipelines. Phase 3 currently employees about 4,000 workers. Those aren't debatable projections; those are real Americans working at high-wage jobs. And the pipeline jobs won't cost the government a dime. In fact, the government will gain revenue from them.

The Keystone XL is also a trade-deficit reducer. News reports say that the U.S. trade deficit declined by 22 percent in the last quarter, primarily due to importing less oil. Rejecting the XL means that much of that Canadian oil will be shipped to China for refining instead. And seeing that oil go elsewhere when foreign hot spots like Syria can drive up oil prices or threaten supplies is not a good idea.

Unfortunately, environmentalists don't seem to care about the Keystone XL's economic merits. They have decided to draw a line in the oil sand at Phase 4. But surely they know that the U.S. leads the world in refining. If Canadian oil is going to be refined, and it is, better to do it under U.S. standards and quality controls. And U.S. workers get the benefits.

The fact is that the Keystone XL pipeline is simply an extension of an already existing program that is working well, creating jobs and expanding U.S. manufacturing. It should be an easy, and quick, decision for any president concerned about the economy.

Merrill Matthews is a resident scholar at the Institute for Policy Innovation in Dallas, Texas. Follow at http://twitter.com/MerrillMatthews
 
‹ Previous Blog Entry
 

Your Opinions and Comments


Be the first to comment on this story!


You must be logged in to post a comment.




Not a subscriber?
Subscriber, but no password?
Forgot password?

Commentaries Archives


Commentaries
Commentaries page govtrack.us
Commentaries who represents me?
Voncille Bielefeld homeHeavenly Touch homeAllstate & McBride Realtyauto chooserDrama KidsTriple R DC Experts

  Copyright © 2007-2015 Wilson County News. All rights reserved. Web development by Drewa Designs.